{"id":5213,"date":"2015-04-21T11:46:27","date_gmt":"2015-04-21T15:46:27","guid":{"rendered":"https:\/\/systep.cl\/report-april-2015\/"},"modified":"2023-01-29T09:32:21","modified_gmt":"2023-01-29T13:32:21","slug":"report-april-2015","status":"publish","type":"post","link":"https:\/\/systep.cl\/en\/report-april-2015\/","title":{"rendered":"Chilean Electricity Market Report April 2015"},"content":{"rendered":"<p><strong>The Systep Team is pleased to present the <a title=\"click here to download the report\" href=\"https:\/\/systep.cl\/documents\/reportes\/042015_Systep_Reporte_Sector_Electrico.pdf\" target=\"blank\" rel=\"noopener\">Monthly Report of the<\/a> Chilean <a title=\"click here to download the report\" href=\"https:\/\/systep.cl\/documents\/reportes\/042015_Systep_Reporte_Sector_Electrico.pdf\" target=\"blank\" rel=\"noopener\">Electricity Sector<\/a><\/strong><\/p>\n<p><strong>(in Spanish).<\/strong><span id=\"more-1872\"><\/span><\/p>\n<p>In this edition of the Report we analyze the study \u201cTechnical-economic effects of wind and solar power integration in the SING \u201d recently published by CDEC-SING, which states the system would be able to integrate up to 1,500 MW NCRE installed capacity by 2017. We discuss about additional aspects to the study, such as existing business conditions for large-scale penetration of NCRE in the electricity market and challenges to compensate cost increases of the system.<\/p>\n<p>We expect that this report will be a contribution to the electricity industry, where we also review the following information:<\/p>\n<p><b>Analysis of the operation of each interconnected system.<\/b><br \/>\n<b>Systep 12-months spot price forecast (SIC and SING).<\/b><br \/>\n<b>Summary by companies.<\/b><br \/>\n<b>Auction prices.<\/b><br \/>\n<b>Non-Conventional Renewable Energies.<\/b><br \/>\n<b>Regulatory monitoring.<\/b><br \/>\n<b>Projects in Environmental Impact Assessment.<\/b><\/p>\n<p>Its distribution is performed monthly.<br \/>\nIf you want to send us any comments please let us know at\u00a0<a href=\"mailto:reporte@systep.cl\">reporte@systep.cl<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Systep is pleased to present the Monthly Report of the Chilean Electricity Sector.<\/p>\n","protected":false},"author":11,"featured_media":4657,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[53],"tags":[],"class_list":["post-5213","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-reporte-en"],"_links":{"self":[{"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/posts\/5213","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/comments?post=5213"}],"version-history":[{"count":1,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/posts\/5213\/revisions"}],"predecessor-version":[{"id":5988,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/posts\/5213\/revisions\/5988"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/media\/4657"}],"wp:attachment":[{"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/media?parent=5213"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/categories?post=5213"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/tags?post=5213"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}