{"id":5226,"date":"2016-07-20T12:24:47","date_gmt":"2016-07-20T16:24:47","guid":{"rendered":"https:\/\/systep.cl\/july-2016-report\/"},"modified":"2023-01-28T10:24:36","modified_gmt":"2023-01-28T14:24:36","slug":"july-2016-report","status":"publish","type":"post","link":"https:\/\/systep.cl\/en\/july-2016-report\/","title":{"rendered":"Chilean Electricity Market Report July 2016"},"content":{"rendered":"<p><strong>The Systep Team is pleased to present the <span style=\"color: #3366ff;\"><a title=\"click here to download the report\" href=\"https:\/\/systep.cl\/documents\/reportes\/072016_Systep_Reporte_Sector_Electrico.pdf\" target=\"blank\" rel=\"noopener\"><span style=\"color: #3366ff;\">Monthly Report of the Chilean Electricity Sector<\/span><\/a><\/span><\/strong><strong>\u00a0(in Spanish).<\/strong><span id=\"more-1953\"><\/span><\/p>\n<p>This edition of the Report analyzes the electrical interconnection of Chile with neighbor countries. Particularly important is the recent reactivation of the circuit Andes \u2013 Salta 345 kV, which connects the Northern Interconnected System (SING) of Chile with the Argentina\u2019s Interconnection System (SADI), and the progress in the interconnection with Peru. This Report reviews the potential benefits that a greater regional integration could bring, focusing primarily on the optimal use of energy resources, as well as the tasks and challenges ahead for future projects.<\/p>\n<p>We expect that this report will be a contribution to the electricity industry, where we also review the following information:<\/p>\n<p><b>Analysis of the operation of each interconnected system.<\/b><br \/>\n<b>Systep 12-months spot price forecast (SIC and SING).<\/b><br \/>\n<b>Summary by companies.<\/b><br \/>\n<b>Auction prices.<\/b><br \/>\n<b>Non-Conventional Renewable Energies.<\/b><br \/>\n<b>Regulatory monitoring.<\/b><br \/>\n<b>Projects in Environmental Impact Assessment.<\/b><\/p>\n<p>Its distribution is performed monthly.<br \/>\nIf you want to send us any comments please let us know at\u00a0<a href=\"mailto:reporte@systep.cl\">reporte@systep.cl<\/a><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Systep is pleased to present the Monthly Report of the Chilean Electricity Sector.<\/p>\n","protected":false},"author":11,"featured_media":4692,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[53],"tags":[],"class_list":["post-5226","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-reporte-en"],"_links":{"self":[{"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/posts\/5226","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/comments?post=5226"}],"version-history":[{"count":2,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/posts\/5226\/revisions"}],"predecessor-version":[{"id":5966,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/posts\/5226\/revisions\/5966"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/media\/4692"}],"wp:attachment":[{"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/media?parent=5226"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/categories?post=5226"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/tags?post=5226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}