{"id":5339,"date":"2018-08-23T10:04:07","date_gmt":"2018-08-23T14:04:07","guid":{"rendered":"https:\/\/systep.cl\/august-2018-report\/"},"modified":"2023-01-28T09:44:13","modified_gmt":"2023-01-28T13:44:13","slug":"august-2018-report","status":"publish","type":"post","link":"https:\/\/systep.cl\/en\/august-2018-report\/","title":{"rendered":"Chilean Electricity Market Report August 2018"},"content":{"rendered":"<p><strong>The Systep Team is pleased to present the <span style=\"color: #3366ff;\"><a title=\"click here to download the report\" href=\"https:\/\/systep.cl\/documents\/reportes\/082018_Systep_Reporte_Sector_Electrico.pdf\" target=\"blank\" rel=\"noopener\"><span style=\"color: #3366ff;\">Monthly Report of the Chilean Electricity Sector<\/span><\/a><\/span>\u00a0(in spanish)<br \/>\n<\/strong><\/p>\n<div id=\"main\">\n<div class=\"row\">\n<div id=\"content\">\n<div id=\"post-2127\" class=\"post-2127 post type-post status-publish format-standard has-post-thumbnail hentry category-market-report\">\n<div class=\"post-content\">\n<p>In this edition, the contribution of batteries to the flexibility of the National Electric System in a high penetration of variable renewable energies (solar and wind) scenario is explored. Through a dispatch schedule that considers all the technical constraints of the generator park (HELO model), the effects on the operation of the system are analyzed by incorporating battery banks into SEN candidate bars, quantifying the economic benefits for a year of study determined.<\/p>\n<p>We expect that this report will be a contribution to the electricity industry, where we also review the following information:<\/p>\n<p><b>Analysis of the operation of each interconnected system.<\/b><br \/>\n<b>Systep 12-months spot price forecast (SIC and SING).<\/b><br \/>\n<b>Summary by companies.<\/b><br \/>\n<b>Auction prices.<\/b><br \/>\n<b>Non-Conventional Renewable Energies.<\/b><br \/>\n<b>Regulatory monitoring.<\/b><br \/>\n<b>Projects in Environmental Impact Assessment.<\/b><\/p>\n<p>Its distribution is performed monthly.<br \/>\nIf you want to send us any comments please let us know at\u00a0<a href=\"mailto:reporte@systep.cl\">reporte@systep.cl<\/a><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Systep is pleased to present the Monthly Report of the Chilean Electricity Sector.<\/p>\n","protected":false},"author":11,"featured_media":4793,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[53],"tags":[],"class_list":["post-5339","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-reporte-en"],"_links":{"self":[{"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/posts\/5339","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/comments?post=5339"}],"version-history":[{"count":2,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/posts\/5339\/revisions"}],"predecessor-version":[{"id":5930,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/posts\/5339\/revisions\/5930"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/media\/4793"}],"wp:attachment":[{"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/media?parent=5339"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/categories?post=5339"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/systep.cl\/en\/wp-json\/wp\/v2\/tags?post=5339"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}