March 2025 Monthly Report
The March editorial is entitled "Blackout in the SEN: A call for attention". It highlights the importance of having external audits to evaluate the origin and effects of the blackout, the operational restriction of the CEN that reduced the transit of power from 1,800 MW to 800 MW in the Nueva Maitencillo-Nueva Pan de Azúcar line between March 4 and 19, and the need to constantly review the regulations and technical criteria that govern the operation of the electricity system.