Expansion of Polpaico – Cardones line would be required by 2030
According to a Systep study, flows in the Polpaico-Cardones 500kV line could reach up to 1,900 MW.
According to a Systep study, flows in the Polpaico-Cardones 500kV line could reach up to 1,900 MW.
Systep is pleased to present the Monthly Report of the Chilean Electricity Sector.
Systep acted as power market advisor to the acquirer.
Systep is pleased to present the Monthly Report of the Chilean Electricity Sector.
In October, the average marginal cost in the SIC was US$35.9/MWh.